Document each area or system observed. For each, write a description and attach a photo. Use the button below to add more conditions as needed.
Document each department or area with a description above and a photo below. Add as many cards as needed.
By signing below, the parties acknowledge that this site survey accurately represents the conditions observed on the date noted. This document serves as the baseline record of existing conditions prior to Stealth Construction commencing work.